The house is continuing to come along. Adam has finished most of the lower level siding. The lower level is board and batten siding and the upper level will be a shingle similar to what was there. When Adam initially told me about the board and batten (vertical) siding I was slightly hesitant because I was not familiar with it. But I trusted it would look good and was excited to have something different than the typical horizontal siding we see in this area. I do like the way it has turned out so far and I have had several compliments from others who have driven by and seen it. Below are a few pictures.
The upstairs bathroom floor is pretty much complete. We went with a 1" hex mosaic tile with a single row of 4x4 tiles as a border.
We are expecting the upstairs vanity from Feser Cabinets late next week. Excited to see this bathroom put together. :)